|
Telescoping
boom versatility combines with operational ease to provide
maximum utilization with the new S 31 HT. This is the concrete
pump that is really two machines in one. In low overhead situations
the boom needs only 18'9" unfolding clearance to provide 87-feet
of horizontal reach. The 15'2" of smooth telescoping action
with Auto-Scissors pipeline allows the operator to keep the
boom in the operational zone and utilize 545 degrees of slewing
action to keep the end hose above the pour and cover a wide
area. The boom utilizes a patented method of extending the
pipeline as the boom telescopes. With this method, the pipeline
extension does not affect overall height when using the telescoping
first section.
On
conventional pours the telescoping action provides precise
placement in wall forms and ICF forms. When pouring in front
of a laser screed, the telescoping action is particularly
convenient with its simple forward and back one level joystick
motion that does not affect end hose height.
When
placing inside the second level, simply point and shoot -
the telescoping action gives added confidence to operators
when they boom in with one lever motion. No need to adjust
multiple boom sections or rely on complicated boom position
sensors to stay within the operating zone - one lever motion
does it all.
Backing
up this smooth boom operation is the Generation III pump kit
with up to 170 cu.yds/hr. output available. This is the most
refined pumping system available with quiet, smooth operation
at all speeds. The twin cylinder pumping cylinders are sequenced
by the exclusive Schwing Rock Valve - the most popular valve
used today with the lowest cost per yard in maintenance costs.
For
single pump owners, or as an addition to a fleet, the S 31 HT
has it all - boom reach, versatility and the ability to perform
in tight situations.
|